Alignment workflow

A simple, repeatable workflow

Use this sequence on every install to reduce rework:

  1. Mount: secure the device and verify it won’t move during adjustment.
  2. Align: adjust azimuth, tilt, and roll to the target values for the site design.
  3. Verify: re-check readings after tightening hardware.
  4. Document: capture photos and any required site notes.
  5. Export: generate the closeout report and share it to your team.

Notes

  • TODO: add recommended “tighten order” for common mount styles.
  • TODO: add guidance for windy conditions and post-tightening drift checks.