Alignment workflow
A simple, repeatable workflow
Use this sequence on every install to reduce rework:
- Mount: secure the device and verify it won’t move during adjustment.
- Align: adjust azimuth, tilt, and roll to the target values for the site design.
- Verify: re-check readings after tightening hardware.
- Document: capture photos and any required site notes.
- Export: generate the closeout report and share it to your team.
Notes
- TODO: add recommended “tighten order” for common mount styles.
- TODO: add guidance for windy conditions and post-tightening drift checks.